Close DB connections once forked processes have completed (LTM 2.4) #908
Triggered via pull request
December 30, 2025 02:16
Status
Cancelled
Total duration
10m 45s
Artifacts
–
ci.yml
on: pull_request
ruff-format
29s
ruff-lint
30s
poetry
31s
yamllint
29s
markdownlint
28s
check-docs-build
33s
changelog
0s
Matrix: check-in-docker
Matrix: unittest
Matrix: unittest_report
Annotations
9 errors
|
unittest (3.11, postgresql, 2.4.20)
Canceling since a higher priority waiting request for CI-refs/pull/470/merge exists
|
|
unittest (3.11, postgresql, 2.4.20)
The operation was canceled.
|
|
unittest (3.12, mysql, 2.4)
Canceling since a higher priority waiting request for CI-refs/pull/470/merge exists
|
|
unittest (3.12, mysql, 2.4)
The operation was canceled.
|
|
unittest_report (3.12, postgresql, 2.4)
Canceling since a higher priority waiting request for CI-refs/pull/470/merge exists
|
|
unittest_report (3.12, postgresql, 2.4)
The operation was canceled.
|
|
unittest (3.10, postgresql, 2.4)
Canceling since a higher priority waiting request for CI-refs/pull/470/merge exists
|
|
unittest (3.10, postgresql, 2.4)
The operation was canceled.
|
|
CI
Canceling since a higher priority waiting request for CI-refs/pull/470/merge exists
|