Skip to content

feat: correlate governancethreshold with reconstructionthreshold #12430

feat: correlate governancethreshold with reconstructionthreshold

feat: correlate governancethreshold with reconstructionthreshold #12430

Triggered via pull request June 22, 2026 15:20
Status Cancelled
Total duration 12m 6s
Artifacts

ci.yml

on: pull_request
Detect non-docs changes  /  detect
24s
Detect non-docs changes / detect
Fast CI checks
20s
Fast CI checks
Check TODOs for issues closed by this PR
24s
Check TODOs for issues closed by this PR
Build MPC Node TEE Docker image
6m 19s
Build MPC Node TEE Docker image
Build Rust Launcher Docker image and verify
3m 21s
Build Rust Launcher Docker image and verify
MPC contract reproducible build
2m 12s
MPC contract reproducible build
Nix build mpc-contract
2m 49s
Nix build mpc-contract
Nix build mpc-node  /  Nix build mpc-node
5m 54s
Nix build mpc-node / Nix build mpc-node
MPC E2E tests
6m 7s
MPC E2E tests
Extra CI checks
1m 20s
Extra CI checks
Matrix: mpc-unittests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Detect non-docs changes / detect
Canceling since a higher priority waiting request for CI-refs/pull/3578/merge exists
Check TODOs for issues closed by this PR
Canceling since a higher priority waiting request for CI-refs/pull/3578/merge exists
Fast CI checks
Canceling since a higher priority waiting request for CI-refs/pull/3578/merge exists
Fast CI checks
The operation was canceled.
Cargo test: contract
Process completed with exit code 100.
CI
Canceling since a higher priority waiting request for CI-refs/pull/3578/merge exists
CI
Canceling since a higher priority waiting request for CI-refs/pull/3578/merge exists