Skip to content

feat(workspace-team): team workspaces, shared resources, workspace-scoped billing, and the #5517 redesign #17123

feat(workspace-team): team workspaces, shared resources, workspace-scoped billing, and the #5517 redesign

feat(workspace-team): team workspaces, shared resources, workspace-scoped billing, and the #5517 redesign #17123

Triggered via pull request August 3, 2026 01:59
Status Cancelled
Total duration 6m 50s
Artifacts 3

ci.yml

on: pull_request
Resolve runner profiles
11s
Resolve runner profiles
Detect validation scopes
40s
Detect validation scopes
Static gate
24s
Static gate
Matrix: playwright_critical
Matrix: playwright_visual
Matrix: ui_p0
Preflight
3m 37s
Preflight
Workspace unit tests
1m 51s
Workspace unit tests
Windows tools-pack payload tests
2m 13s
Windows tools-pack payload tests
Web workspace tests
5m 4s
Web workspace tests
E2E Vitest
5m 10s
E2E Vitest
Validate workspace
3s
Validate workspace
Runtime summary
4s
Runtime summary
Fit to window
Zoom out
Zoom in

Annotations

16 errors, 3 warnings, and 1 notice
Web workspace tests
Canceling since a higher priority waiting request for ci-6142 exists
Web workspace tests
The operation was canceled.
E2E Vitest
Canceling since a higher priority waiting request for ci-6142 exists
E2E Vitest
The operation was canceled.
UI P0 (project-workspace)
Canceling since a higher priority waiting request for ci-6142 exists
UI P0 (project-workspace)
The operation was canceled.
UI P0 (entry-settings)
Canceling since a higher priority waiting request for ci-6142 exists
UI P0 (entry-settings)
The operation was canceled.
Playwright visual (settings-workspace)
Canceling since a higher priority waiting request for ci-6142 exists
Playwright visual (settings-workspace)
The operation was canceled.
UI P0 (project-runtime)
Canceling since a higher priority waiting request for ci-6142 exists
UI P0 (project-runtime)
The operation was canceled.
UI P0 (workspace-restoration)
Canceling since a higher priority waiting request for ci-6142 exists
UI P0 (workspace-restoration)
The operation was canceled.
Validate workspace
Process completed with exit code 1.
ci
Canceling since a higher priority waiting request for ci-6142 exists
Detect validation scopes
Node.js 20 is deprecated. The following actions target Node.js 20 but are being forced to run on Node.js 24: actions/upload-artifact@v4. For more information see: https://github.blog/changelog/2025-09-19-deprecation-of-node-20-on-github-actions-runners/
E2E Vitest
merge_group changed-file resolution failed; falling back to the full plan: Error: merge_group compare result reached GitHub's 300-file ceiling
E2E Vitest
merge_group changed-file resolution failed; falling back to the full plan: Error: Command failed: /opt/hostedtoolcache/node/24.18.0/x64/bin/node /tmp/scopes-test-7U2vcR/gh-stub.mjs api repos/nexu-io/open-design/compare/1111111111111111111111111111111111111111...2222222222222222222222222222222222222222
🎭 Playwright Run Summary
3 skipped 17 passed (2.8m)

Artifacts

Produced during runtime
Name Size Digest
handoff-report-visual-pr
438 Bytes
sha256:e7cf61be001e5e2307cd376bbe712d8fad2bfd382a37f1d6bce7e64cbee5b036
visual-pr-capture-6142-30778176246-entry-navigation
5.5 MB
sha256:b6c0c30bb477e2c89bf08bdd14f3d12e1f121e779d8fb15276b9a8530c71b455
visual-pr-capture-6142-30778176246-settings-workspace
2.39 MB
sha256:1152580a9339f7d1e84c42d8822dc530ee74a13ba720528672a022e74d9c8942