Send create connection after disconnect from management plane #4549
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
ci.yml
on: pull_request
Build Unsigned Snapshot
1m 52s
Lint
3m 56s
Unit Tests
2m 6s
Unit tests with race condition detection
2m 24s
Performance Tests
4m 41s
Matrix: Integration Tests
Publish NGINX Agent v3 packages
/
Set workflow variables
Publish NGINX Agent v3 packages
/
Update Release Draft
Publish NGINX Agent v3 packages
/
Upload packages
Publish NGINX Agent v3 packages
/
Merge release branch back into V3 branch
Annotations
7 errors
|
Unit Tests
Process completed with exit code 2.
|
|
Unit tests with race condition detection
Process completed with exit code 2.
|
|
Integration Tests (alpine, 3.19)
Process completed with exit code 2.
|
|
Integration Tests (redhatenterprise, 9)
The job was canceled because "alpine_3_19" failed.
|
|
Integration Tests (redhatenterprise, 9)
The operation was canceled.
|
|
Integration Tests (ubuntu, 22.04)
The job was canceled because "alpine_3_19" failed.
|
|
Integration Tests (ubuntu, 22.04)
The operation was canceled.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
load-test-results
Expired
|
385 Bytes |
sha256:2c1406ccaf5318623ed4d144dfa0b83a7ef60e48222c5e461e822e6b165315e5
|
|
|
nginx-agent-unsigned-snapshots
Expired
|
65.3 MB |
sha256:223b4dde68ad3d589764fc6e66f59afbe0898ef0da575e9c9274011094647986
|
|