Skip to content

Merge pull request #8432 from nightscout/wip/bewest/update-bridge-deps #5559

Merge pull request #8432 from nightscout/wip/bewest/update-bridge-deps

Merge pull request #8432 from nightscout/wip/bewest/update-bridge-deps #5559

Triggered via push February 27, 2026 22:03
Status Failure
Total duration 2m 55s
Artifacts

main.yml

on: push
Matrix: Run Tests
Publish to Docker Hub
0s
Publish to Docker Hub
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Run Tests (14.x, 4.4)
Process completed with exit code 1.
Run Tests (14.x, 6)
The strategy configuration was canceled because "test._14_x_4_4" failed
Run Tests (14.x, 6)
Process completed with exit code 1.
Run Tests (14.x, 5)
The strategy configuration was canceled because "test._14_x_4_4" failed
Run Tests (14.x, 5)
The operation was canceled.
Run Tests (16.x, 4.4)
The strategy configuration was canceled because "test._14_x_4_4" failed
Run Tests (16.x, 4.4)
The operation was canceled.
Run Tests (16.x, 5)
The strategy configuration was canceled because "test._14_x_4_4" failed
Run Tests (16.x, 5)
The operation was canceled.
Run Tests (16.x, 6)
The strategy configuration was canceled because "test._14_x_4_4" failed
Run Tests (16.x, 6)
The operation was canceled.