Skip to content

Test Installation Scripts #919

Test Installation Scripts

Test Installation Scripts #919

Triggered via schedule May 11, 2026 00:45
Status Failure
Total duration 1m 18s
Artifacts

ci.yaml

on: schedule
Matrix: deb
Matrix: rpm-minimal
Matrix: rpm
Fit to window
Zoom out
Zoom in

Annotations

8 errors
NodeJS 22(rockylinux:8)
Process completed with exit code 1.
NodeJS 25(rockylinux:8)
The strategy configuration was canceled because "rpm._22_rockylinux_8" failed
NodeJS 25(rockylinux:8)
The operation was canceled.
NodeJS 26(rockylinux:8)
The strategy configuration was canceled because "rpm._22_rockylinux_8" failed
NodeJS 26(rockylinux:9)
The strategy configuration was canceled because "rpm._22_rockylinux_8" failed
NodeJS 26(rockylinux:9)
The operation was canceled.
NodeJS 22(rockylinux:9)
The strategy configuration was canceled because "rpm._22_rockylinux_8" failed
NodeJS 20(rockylinux:8)
The strategy configuration was canceled because "rpm._22_rockylinux_8" failed