Skip to content

changing NS logo

changing NS logo #2

Triggered via push November 18, 2025 20:06
Status Failure
Total duration 40s
Artifacts

docker-tests.yml

on: push
Matrix: Run Tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Run Tests (20)
Process completed with exit code 1.
Run Tests (24)
The strategy configuration was canceled because "test._20" failed
Run Tests (24)
The operation was canceled.
Run Tests (22)
The strategy configuration was canceled because "test._20" failed
Run Tests (22)
The operation was canceled.