Skip to content

Upstream all manual updates #23

@leamas

Description

@leamas

Currently, here is a number of forked repos used for initial setup of the manual:

Plugin PR
Deviation_pi RooieDirk/Deviation_pi#12

aisradar currently lives by nohal, but should be moved to the canonical Verezano upstream as soon as PR is accepted.

The ultimate goal is to transfer control to upstream for these repos. Workflow for each plugin:

  1. Possibly update to standard config (Using standard/simplified config #22)
  2. Make a PR to upstream
  3. Wait for PR to be merged.
  4. Update site.yml and sources.state to use the upstream repo
  5. Remove the opencpn-manuals fork
  6. Remove entry in table above

We should have made a PR for all repos before we announce the manual.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions