Skip to content

[Cherry-pick][2.24] Archive the must-gather collected#607

Merged
dbasunag merged 1 commit into2.24from
CherryPick-2.24-d020
Sep 12, 2025
Merged

[Cherry-pick][2.24] Archive the must-gather collected#607
dbasunag merged 1 commit into2.24from
CherryPick-2.24-d020

Conversation

@rhods-ci-bot
Copy link
Copy Markdown
Contributor

Cherry-picked #605 into 2.24. Requested by: dbasunag

@rhods-ci-bot rhods-ci-bot requested a review from a team as a code owner September 12, 2025 18:20
@coderabbitai
Copy link
Copy Markdown
Contributor

coderabbitai bot commented Sep 12, 2025

Important

Review skipped

Auto reviews are disabled on base/target branches other than the default branch.

Please check the settings in the CodeRabbit UI or the .coderabbit.yaml file in this repository. To trigger a single review, invoke the @coderabbitai review command.

You can disable this status message by setting the reviews.review_status to false in the CodeRabbit configuration file.

✨ Finishing touches
🧪 Generate unit tests
  • Create PR with unit tests
  • Post copyable unit tests in a comment
  • Commit unit tests in branch CherryPick-2.24-d020

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands and usage tips.

@github-actions
Copy link
Copy Markdown

The following are automatically added/executed:

  • PR size label.
  • Run pre-commit
  • Run tox
  • Add PR author as the PR assignee
  • Build image based on the PR

Available user actions:

  • To mark a PR as WIP, add /wip in a comment. To remove it from the PR comment /wip cancel to the PR.
  • To block merging of a PR, add /hold in a comment. To un-block merging of PR comment /hold cancel.
  • To mark a PR as approved, add /lgtm in a comment. To remove, add /lgtm cancel.
    lgtm label removed on each new commit push.
  • To mark PR as verified comment /verified to the PR, to un-verify comment /verified cancel to the PR.
    verified label removed on each new commit push.
  • To Cherry-pick a merged PR /cherry-pick <target_branch_name> to the PR. If <target_branch_name> is valid,
    and the current PR is merged, a cherry-picked PR would be created and linked to the current PR.
  • To build and push image to quay, add /build-push-pr-image in a comment. This would create an image with tag
    pr-<pr_number> to quay repository. This image tag, however would be deleted on PR merge or close action.
Supported labels

{'/build-push-pr-image', '/cherry-pick', '/verified', '/wip', '/hold', '/lgtm'}

@dbasunag
Copy link
Copy Markdown
Collaborator

/build-push-pr-image

@github-actions
Copy link
Copy Markdown

Status of building tag pr-607: success.
Status of pushing tag pr-607 to image registry: success.

@dbasunag dbasunag merged commit cdfe48d into 2.24 Sep 12, 2025
8 checks passed
@dbasunag dbasunag deleted the CherryPick-2.24-d020 branch September 12, 2025 19:40
@github-actions
Copy link
Copy Markdown

Status of building tag 2.24: success.
Status of pushing tag 2.24 to image registry: success.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants