Skip to content

do.sh: Upgrade pip before trying to install requirements. #613

do.sh: Upgrade pip before trying to install requirements.

do.sh: Upgrade pip before trying to install requirements. #613

Triggered via pull request September 29, 2025 10:22
Status Failure
Total duration 17s
Artifacts

test.yml

on: pull_request
Matrix: lint
Fit to window
Zoom out
Zoom in

Annotations

11 errors
lint (3.12)
Process completed with exit code 1.
lint (3.11)
Process completed with exit code 1.
lint (3.11)
The strategy configuration was canceled because "lint._3_12" failed
lint (3.8)
The operation was canceled.
lint (3.8)
The strategy configuration was canceled because "lint._3_12" failed
lint (3.10)
The operation was canceled.
lint (3.10)
The strategy configuration was canceled because "lint._3_12" failed
lint (3.9)
The operation was canceled.
lint (3.9)
The strategy configuration was canceled because "lint._3_12" failed
lint (3.13)
The operation was canceled.
lint (3.13)
The strategy configuration was canceled because "lint._3_12" failed