build(deps): bump the go-modules group with 30 updates #7
test-pull-request.yml
on: pull_request
Preparation
4s
Upload Workflow Event Payload
3s
Matrix: Smoke Test
Smoke Test
2s
Annotations
6 errors
|
Smoke Test (ubi-10-builder, ubuntu-22.04, builders/builder)
The run was canceled by @pacostas.
|
|
Smoke Test (ubi-10-builder, ubuntu-22.04, builders/builder)
The operation was canceled.
|
|
Smoke Test (ubi-10-builder-buildpackless, ubuntu-22.04, builders/builder_buildpackless)
The run was canceled by @pacostas.
|
|
Smoke Test (ubi-10-builder-buildpackless, ubuntu-22.04, builders/builder_buildpackless)
The operation was canceled.
|
|
Smoke Test
Process completed with exit code 1.
|
|
Test Pull Request
The run was canceled by @pacostas.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
event-payload
Expired
|
17.6 KB |
sha256:1874992b167cb6a7f1d530c044a4f677c7a77ffa61836143b0a6874d866234a7
|
|