Rebase onto upstream/master (2026-08-27): 575 commits (d5b9f6c8..d785b192) #580
pr.yml
on: pull_request
policy
47s
Matrix: e2e_shards
Matrix: general_tests
Canary Dry Run
20s
Matrix: verify_serialized_server
Annotations
41 errors and 3 warnings
|
Build
Canceling since a higher priority waiting request for pr-335 exists
|
|
Build
The operation was canceled.
|
|
Canary Dry Run
Canceling since a higher priority waiting request for pr-335 exists
|
|
Canary Dry Run
The operation was canceled.
|
|
e2e shard (1/3)
Canceling since a higher priority waiting request for pr-335 exists
|
|
e2e shard (1/3)
The operation was canceled.
|
|
Typecheck + Release Registry
Canceling since a higher priority waiting request for pr-335 exists
|
|
Typecheck + Release Registry
The operation was canceled.
|
|
General tests (server (5/5))
Canceling since a higher priority waiting request for pr-335 exists
|
|
General tests (server (5/5))
The operation was canceled.
|
|
Verify serialized server suites (3/5)
Canceling since a higher priority waiting request for pr-335 exists
|
|
Verify serialized server suites (3/5)
The operation was canceled.
|
|
Verify serialized server suites (1/5)
Canceling since a higher priority waiting request for pr-335 exists
|
|
Verify serialized server suites (1/5)
The operation was canceled.
|
|
General tests (server (3/5))
Canceling since a higher priority waiting request for pr-335 exists
|
|
General tests (server (3/5))
The operation was canceled.
|
|
General tests (server (2/5))
Canceling since a higher priority waiting request for pr-335 exists
|
|
General tests (server (2/5))
The operation was canceled.
|
|
General tests (server (1/5))
Canceling since a higher priority waiting request for pr-335 exists
|
|
General tests (server (1/5))
The operation was canceled.
|
|
General tests (workspaces-a (2/2))
Canceling since a higher priority waiting request for pr-335 exists
|
|
General tests (workspaces-a (2/2))
The operation was canceled.
|
|
General tests (server (4/5))
Canceling since a higher priority waiting request for pr-335 exists
|
|
General tests (server (4/5))
The operation was canceled.
|
|
Verify serialized server suites (2/5)
Canceling since a higher priority waiting request for pr-335 exists
|
|
General tests (workspaces-b)
Canceling since a higher priority waiting request for pr-335 exists
|
|
General tests (workspaces-b)
The operation was canceled.
|
|
Verify serialized server suites (2/5)
The operation was canceled.
|
|
Verify serialized server suites (5/5)
Canceling since a higher priority waiting request for pr-335 exists
|
|
Verify serialized server suites (5/5)
The operation was canceled.
|
|
e2e shard (2/3)
Canceling since a higher priority waiting request for pr-335 exists
|
|
e2e shard (2/3)
The operation was canceled.
|
|
Verify serialized server suites (4/5)
Canceling since a higher priority waiting request for pr-335 exists
|
|
Verify serialized server suites (4/5)
The operation was canceled.
|
|
General tests (workspaces-a (1/2))
Canceling since a higher priority waiting request for pr-335 exists
|
|
General tests (workspaces-a (1/2))
The operation was canceled.
|
|
e2e shard (3/3)
Canceling since a higher priority waiting request for pr-335 exists
|
|
e2e shard (3/3)
The operation was canceled.
|
|
verify
Process completed with exit code 1.
|
|
e2e
Process completed with exit code 1.
|
|
PR
Canceling since a higher priority waiting request for pr-335 exists
|
|
e2e shard (1/3)
No files were found with the provided path: tests/e2e/playwright-report/
tests/e2e/test-results/. No artifacts will be uploaded.
|
|
e2e shard (2/3)
No files were found with the provided path: tests/e2e/playwright-report/
tests/e2e/test-results/. No artifacts will be uploaded.
|
|
e2e shard (3/3)
No files were found with the provided path: tests/e2e/playwright-report/
tests/e2e/test-results/. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
pr-lockfile
|
148 KB |
sha256:5bf6e5e076f716327e6a1fd94f9753ba0a9de0beedfb9b1bd11eaaac1b310b31
|
|