Skip to content

[flink] Upgrade Flink dependency to 1.20.3 and 2.1.1 (#1988) #56

[flink] Upgrade Flink dependency to 1.20.3 and 2.1.1 (#1988)

[flink] Upgrade Flink dependency to 1.20.3 and 2.1.1 (#1988) #56

Triggered via push November 26, 2025 16:01
Status Cancelled
Total duration 1d 0h 0m 6s
Artifacts

ci.yaml

on: push
Matrix: Java 11 / build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Java 11 / flink
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Java 11 / core
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Java 11 / lake
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s