Open
Description
Describe the current behavior
The tee point nodes are not linked to a substation and thus when using the GeographicalLayoutFactory, no position is read. The force layout algorithm is then used to find their position.
Describe the expected behavior
The position of the tee-point nodes could be determined using the surronding voltage levels that have a geographical position (through interpolation).
Describe the motivation
It may improve the geogrpahical accuracy of the tee point node positions.
Extra Information
No response