Skip to content

chore: update references from probitas-test/cli to probitas-test/prob… #13

chore: update references from probitas-test/cli to probitas-test/prob…

chore: update references from probitas-test/cli to probitas-test/prob… #13

Triggered via push December 27, 2025 10:12
Status Failure
Total duration 14s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Test (ubuntu-latest, latest)
Process completed with exit code 127.
Test (ubuntu-latest, 0.7.3)
The strategy configuration was canceled because "test.ubuntu-latest_latest" failed
Test (ubuntu-latest, 0.7.3)
The operation was canceled.
Test (macos-latest, latest)
The strategy configuration was canceled because "test.ubuntu-latest_latest" failed
Test (macos-latest, latest)
The operation was canceled.
Test (macos-latest, 0.7.3)
The strategy configuration was canceled because "test.ubuntu-latest_latest" failed
Test (macos-latest, 0.7.3)
Error: Path Validation Error: Path(s) specified in the action for caching do(es) not exist, hence no cache is being saved.
Test (macos-latest, 0.7.3)
The operation was canceled.
Test (windows-latest, latest)
The strategy configuration was canceled because "test.ubuntu-latest_latest" failed
Test (windows-latest, latest)
The operation was canceled.
Test (windows-latest, 0.7.3)
The strategy configuration was canceled because "test.ubuntu-latest_latest" failed
Test (windows-latest, 0.7.3)
The operation was canceled.