*[Injection Optics Global Corrs]: Test of tools. Rephased BPMs. Confirmed local coupling corrections, measured virgin machine at injection optics and did global corrections. Reached similar performance as previous years. First attempts of total phase corrections, used the ones from 2024. First use of new Segment-by-Segment.
28
30
*[Coupling Through Squeeze + dE/E]: Checked local coupling and local corrections at 2 m, 1.2 m, 30_60 cm and 18_60 cm (CMS $\beta$x_$\beta$y cm). While at 18_60cm, we attempted dE/E correction to no avail. We also slowly removed the triplet local corrections to see 275 % beta beating, again attempted dE/E correction to no avail. Tested Arc45 bump knobs and arc45+arc81 bump knobs. Tested effectiveness of local coupling knobs from 2024 (by reducing to 95%).
31
+
*[Injection and Ramp]: Arc-by-Arc coupling and global corrections at inj. Tried large amp kicks and failed. Beta-Beating during the ramp. Arc corrections. Global corrections at flat-top (2m).
32
+
*[Measurements through the Squeeze]: Recheck 2m; Optics at 1.2m (global corrections, arc-by-arc coupling) taken from 2m work well; Optics at 60cm needs arc-by-arc coupling iteration; Optics at 18cm Kmod, local corrections, new B1 local correction.