Skip to content

ci: Try different runners, drop 386 #42

ci: Try different runners, drop 386

ci: Try different runners, drop 386 #42

Triggered via push November 26, 2025 13:46
Status Failure
Total duration 4m 18s
Artifacts

release.yaml

on: push
Matrix: goreleaser
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 4 warnings
goreleaser (ubuntu-latest)
The process '/opt/hostedtoolcache/goreleaser-action/2.12.7/x64/goreleaser' failed with exit code 1
goreleaser (macos-latest)
The strategy configuration was canceled because "goreleaser.ubuntu-latest" failed
goreleaser (macos-latest)
The operation was canceled.
goreleaser (windows-latest)
The strategy configuration was canceled because "goreleaser.ubuntu-latest" failed
goreleaser (windows-latest)
The operation was canceled.
goreleaser (ubuntu-latest)
You are using 'latest' as default version. Will lock to '~> v2'.
goreleaser (macos-latest)
You are using 'latest' as default version. Will lock to '~> v2'.
goreleaser (macos-latest)
gcc 15.2.0 is already installed and up-to-date. To reinstall 15.2.0, run: brew reinstall gcc
goreleaser (windows-latest)
You are using 'latest' as default version. Will lock to '~> v2'.