Skip to content

Tidy up includes

Tidy up includes #6

Triggered via push August 28, 2025 03:21
Status Success
Total duration 27m 50s
Artifacts

test.yml

on: push
Run tests on Linux (openblas)
5m 38s
Run tests on Linux (openblas)
Run tests on Linux (mkl)
24m 23s
Run tests on Linux (mkl)
Run tests on Windows (mkl)
5m 25s
Run tests on Windows (mkl)
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Test results (windows mkl): 99% tests passed
99% tests passed, 1 tests failed out of 758 Total Test time (real) = 48.96 sec The following tests FAILED: 81 - dynadjust-name-01 (Exit code 0xc0000409 )
Test results (openblas): 99% tests passed
99% tests passed, 2 tests failed out of 759 Total Test time (real) = 69.87 sec The following tests FAILED: 5 - test-gnss-network (Failed) 33 - adjust-urban-network-thread-02 (Subprocess aborted)
Test results (mkl): 98% tests passed
98% tests passed, 16 tests failed out of 759 Total Test time (real) = 1132.28 sec The following tests FAILED: 4 - adjust-gnss-network (Failed) 5 - test-gnss-network (Failed) 13 - adjust-gnss-network-block1 (Timeout) 14 - adjust-gnss-network-phased (Timeout) 15 - adjust-gnss-network-verb (Failed) 16 - adjust-gnss-network-staged-a (Timeout) 17 - adjust-gnss-network-staged-b (Timeout) 21 - adjust-urban-network-verbose (Failed) 22 - adjust-urban-network (Timeout) 23 - plot-urban-network-01 (Failed) 24 - plot-urban-network-02 (Failed) 31 - adjust-urban-network-thread-01 (Timeout) 33 - adjust-urban-network-thread-02 (Timeout) 37 - adjust-urban-network-stage (Timeout) 82 - dynadjust-name-01 (Timeout) 622 - adjust-dbid-02 (Failed)