Update binary location #7
test.yml
on: push
Run tests on Linux (openblas)
6m 1s
Run tests on Linux (mkl)
24m 39s
Run tests on Windows (mkl)
5m 33s
Annotations
3 errors
|
Test results (windows mkl): 99% tests passed
99% tests passed, 1 tests failed out of 758
Total Test time (real) = 49.51 sec
The following tests FAILED:
81 - dynadjust-name-01 (Exit code 0xc0000409
)
|
|
Test results (openblas): 99% tests passed
99% tests passed, 1 tests failed out of 759
Total Test time (real) = 64.64 sec
The following tests FAILED:
5 - test-gnss-network (Failed)
|
|
Test results (mkl): 98% tests passed
98% tests passed, 16 tests failed out of 759
Total Test time (real) = 1129.82 sec
The following tests FAILED:
4 - adjust-gnss-network (Failed)
5 - test-gnss-network (Failed)
13 - adjust-gnss-network-block1 (Timeout)
14 - adjust-gnss-network-phased (Timeout)
15 - adjust-gnss-network-verb (Failed)
16 - adjust-gnss-network-staged-a (Timeout)
17 - adjust-gnss-network-staged-b (Timeout)
21 - adjust-urban-network-verbose (Failed)
22 - adjust-urban-network (Timeout)
23 - plot-urban-network-01 (Failed)
24 - plot-urban-network-02 (Failed)
31 - adjust-urban-network-thread-01 (Timeout)
33 - adjust-urban-network-thread-02 (Timeout)
37 - adjust-urban-network-stage (Timeout)
82 - dynadjust-name-01 (Timeout)
622 - adjust-dbid-02 (Failed)
|