Skip to content

Release 0.8.1

Release 0.8.1 #111

Triggered via push July 2, 2026 04:27
Status Failure
Total duration 41s
Artifacts

main.yml

on: push
Matrix: Test
Check code formatting
8s
Check code formatting
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Test (beta, ubuntu-latest, --features=version-sync)
Process completed with exit code 101.
Test (1.81.0, ubuntu-latest, --features=version-sync)
The strategy configuration was canceled because "test.beta_ubuntu-latest_--feat" failed
Test (1.81.0, ubuntu-latest, --features=version-sync)
The operation was canceled.
Test (stable, ubuntu-latest, --features=version-sync)
The strategy configuration was canceled because "test.beta_ubuntu-latest_--feat" failed
Test (stable, ubuntu-latest, --features=version-sync)
The operation was canceled.