Skip to content

Connect pre-existing try build perf runs and final merge perf runs for triage #891

Open
@Mark-Simulacrum

Description

@Mark-Simulacrum

One of the current hassles during perf triage is following up based on the try runs and their results when doing triage of the final merge. It should be relatively easy for us to generate a listing of the try build runs (at least their comparison pages) -- maybe even just "all runs done for the second commits PR" or something like that.

In the future, we may wish to connect perf justification to this with a rust-timer invocation, such that we can at least link to those comments. I'm hesitant to inline them directly into the database, since then there's edits etc, but links should be easy enough.

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions