Skip to content

ci/cd: remove client.py file to verify why the workflows are failing #27

ci/cd: remove client.py file to verify why the workflows are failing

ci/cd: remove client.py file to verify why the workflows are failing #27

Triggered via push July 17, 2025 09:04
Status Failure
Total duration 43s
Artifacts
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (3.11)
Process completed with exit code 2.
test (3.10)
Process completed with exit code 2.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.12)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
test (3.13)
The operation was canceled.
test (3.13)
The strategy configuration was canceled because "test._3_11" failed
lint
Process completed with exit code 1.