Skip to content

Cluster disk utilization raised from ~65% to >90% while doing backup with Manager #4321

Open
@mikliapko

Description

@mikliapko

Environment:

  • Scylla Cloud deployment
  • MultiDC cluster (3+3)
  • AWS, i4i.2xlarge (1875 GB NVMe SSD)
  • ~1TB dataset

Description:

  1. Initial disk utilization before backup is around 65%
  2. Right after cluster population with data (~1TB) using C-S trigger Manager backup
  3. Monitor disk utilization by cluster

Disk utilization by cluster starts to grow right after backup process start, reaches some peak values (~99%) and then drops down to initial state of 65% by the end of the backup.

Important point here is that the utilization reaches 90% and since we are about to have an automatic cluster scale out (X-Cloud) this particular scenario would lead to undesired scale out.

Image

Image

Logs

Jenkins job - https://jenkins.scylladb.com/job/manager-master/job/1-1-restore/job/prepare-snapshot-aws-multi-dc/13/

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions