Skip to content

Include default tokenizer file. #15

Include default tokenizer file.

Include default tokenizer file. #15

Triggered via push October 29, 2025 18:56
Status Failure
Total duration 20s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 22.
build (3.8)
The strategy configuration was canceled because "build._3_9" failed
build (3.8)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_9" failed
build (3.10)
The operation was canceled.