Skip to content

fix: resolve symlinks in bashclaw entry point for correct BASHCLAW_ROOT #24

fix: resolve symlinks in bashclaw entry point for correct BASHCLAW_ROOT

fix: resolve symlinks in bashclaw entry point for correct BASHCLAW_ROOT #24

Triggered via push February 19, 2026 05:47
Status Failure
Total duration 1m 52s
Artifacts

ci.yml

on: push
integration
12s
integration
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
test (ubuntu-latest)
Process completed with exit code 1.
test (macos-latest)
The strategy configuration was canceled because "test.ubuntu-latest" failed
test (macos-latest)
The operation was canceled.
test (macos-latest)
jq 1.8.1 is already installed and up-to-date. To reinstall 1.8.1, run: brew reinstall jq