Skip to content

better handling a pure B modes #567

better handling a pure B modes

better handling a pure B modes #567

Triggered via push April 20, 2026 12:27
Status Failure
Total duration 4m 32s
Artifacts

testing.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (ubuntu-latest, 3.10)
Process completed with exit code 1.
build (ubuntu-latest, 3.11)
The strategy configuration was canceled because "build.ubuntu-latest_3_10" failed
build (ubuntu-latest, 3.11)
The operation was canceled.
build (ubuntu-latest, 3.12)
The strategy configuration was canceled because "build.ubuntu-latest_3_10" failed
build (ubuntu-latest, 3.12)
The operation was canceled.
build (ubuntu-latest, 3.13)
The strategy configuration was canceled because "build.ubuntu-latest_3_10" failed
build (ubuntu-latest, 3.13)
The operation was canceled.