Skip to content

ci/ghcr

ci/ghcr #165

Triggered via schedule June 4, 2025 04:02
Status Failure
Total duration 31s
Artifacts

docker.yml

on: schedule
Matrix: docker-build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build-centos-7
Process completed with exit code 1.
build-debian-10
The operation was canceled.
build-debian-10
The strategy configuration was canceled because "docker-build.centos-7" failed
build-debian-12
The operation was canceled.
build-debian-12
The strategy configuration was canceled because "docker-build.centos-7" failed
build-bash-3.2
The operation was canceled.
build-bash-3.2
The strategy configuration was canceled because "docker-build.centos-7" failed
build-debian-11
The operation was canceled.
build-debian-11
The strategy configuration was canceled because "docker-build.centos-7" failed