Description
When the time estimate from task/project is removed and then saved the time estimate is not removed. Instead when it is replaced with zero and saved it is removed.
Steps To Reproduce
- Create a project/task
- Edit the project/task
- Remove the project/task
- Save the project/task
Self-hosted or Cloud?
Self-Hosted
Version of solidtime: (for self-hosted)
v0.8.0
solidtime self-hosting guide: (for self-hosted)
official docker compose guid