Description
When updating an existing time entry's project the billable status does not update accordingly. If the previous time entry's project is non-billable and updated project is billable, the time entry will continue to show non-billable.
Steps To Reproduce
- Create two projects, one billable, one non-billable.
- Create a time entry with non-billable project.
- Update the time entry to use billable project.
Observe how the time entry continues to have non-billable status.
Self-hosted or Cloud?
Self-Hosted
Version of solidtime: (for self-hosted)
0.10