Skip to content

chore(deps): Bump the cargo group across 2 directories with 3 updates #21

chore(deps): Bump the cargo group across 2 directories with 3 updates

chore(deps): Bump the cargo group across 2 directories with 3 updates #21

Triggered via pull request March 3, 2026 20:26
Status Failure
Total duration 9m 49s
Artifacts

ci.yml

on: pull_request
Matrix: build
Matrix: build_with_no_default_features
Matrix: check
Matrix: unit
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 2 warnings
Unit Tests (doc)
Process completed with exit code 1.
Unit Tests (default)
The strategy configuration was canceled because "unit.doc_--doc_--all-features_" failed
Unit Tests (default)
The operation was canceled.
build (ubuntu-latest)
Process completed with exit code 1.
build (windows-latest)
The strategy configuration was canceled because "build.ubuntu-latest" failed
build (windows-latest)
The operation was canceled.
build (macos-latest)
The strategy configuration was canceled because "build.ubuntu-latest" failed
build (macos-latest)
The operation was canceled.
check (ubuntu-latest)
Restore cache failed: Some specified paths were not resolved, unable to cache dependencies.
check (macos-latest)
Restore cache failed: Some specified paths were not resolved, unable to cache dependencies.