chore: switch to AGPL-3.0 license for v1.0.0 release #22
Annotations
5 errors
|
test (22)
Process completed with exit code 1.
|
|
test (20)
Process completed with exit code 1.
|
|
test (20)
The strategy configuration was canceled because "test._22" failed
|
|
test (18)
The operation was canceled.
|
|
test (18)
The strategy configuration was canceled because "test._22" failed
|