Skip to content

chore: Massive Cleanup - Remove 446 MB Binaries + Zombie Configs (27% Repo Size Reduction) #460

chore: Massive Cleanup - Remove 446 MB Binaries + Zombie Configs (27% Repo Size Reduction)

chore: Massive Cleanup - Remove 446 MB Binaries + Zombie Configs (27% Repo Size Reduction) #460

Triggered via pull request February 23, 2026 07:05
Status Cancelled
Total duration 1m 36s
Artifacts

pr-validation.yml

on: pull_request
Scope Classifier
19s
Scope Classifier
Docs Link Integrity
7s
Docs Link Integrity
Root Allowlist
6s
Root Allowlist
build-validation  /  Build Validation
1m 7s
build-validation / Build Validation
config-tests  /  Config Tests
37s
config-tests / Config Tests
auth-core-tests  /  Auth Core Tests
1m 8s
auth-core-tests / Auth Core Tests
auth-provider-tests  /  Auth Provider Tests
47s
auth-provider-tests / Auth Provider Tests
security-tests  /  Security Tests
38s
security-tests / Security Tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 8 warnings
Root Allowlist
Process completed with exit code 1.
build-validation / Build Validation
Canceling since a higher priority waiting request for refs/pull/355/merge exists
build-validation / Build Validation
The operation was canceled.
auth-core-tests / Auth Core Tests
Canceling since a higher priority waiting request for refs/pull/355/merge exists
auth-core-tests / Auth Core Tests
The operation was canceled.
Basic Validation
Process completed with exit code 1.
PR Validation
Canceling since a higher priority waiting request for refs/pull/355/merge exists
PR Validation
Canceling since a higher priority waiting request for refs/pull/355/merge exists
PR Validation
Canceling since a higher priority waiting request for refs/pull/355/merge exists
Root Allowlist
The process '/usr/bin/git' failed with exit code 128
Docs Link Integrity
The process '/usr/bin/git' failed with exit code 128
Scope Classifier
The process '/usr/bin/git' failed with exit code 128
config-tests / Config Tests
The process '/usr/bin/git' failed with exit code 128
security-tests / Security Tests
The process '/usr/bin/git' failed with exit code 128
auth-provider-tests / Auth Provider Tests
The process '/usr/bin/git' failed with exit code 128
build-validation / Build Validation
The process '/usr/bin/git' failed with exit code 128
auth-core-tests / Auth Core Tests
The process '/usr/bin/git' failed with exit code 128