Skip to content

Add openbolt acceptance test #1717

Add openbolt acceptance test

Add openbolt acceptance test #1717

Triggered via pull request November 29, 2025 17:07
Status Cancelled
Total duration 1m 32s
Artifacts

ci.yml

on: pull_request
Puppet  /  Static validations
21s
Puppet / Static validations
Matrix: Puppet / acceptance
Matrix: Puppet / unit
Puppet  /  Test suite
4s
Puppet / Test suite
Fit to window
Zoom out
Zoom in

Annotations

15 errors and 2 warnings
Puppet / Puppet 8 - AlmaLinux 9
Canceling since a higher priority waiting request for 885/merge exists
Puppet / Puppet 8 - AlmaLinux 9
The operation was canceled.
Puppet / 8 (Ruby 3.2)
Canceling since a higher priority waiting request for 885/merge exists
Puppet / 8 (Ruby 3.2)
The operation was canceled.
Puppet / Puppet 8 - Ubuntu 22.04
Canceling since a higher priority waiting request for 885/merge exists
Puppet / Puppet 8 - Ubuntu 22.04
The operation was canceled.
Puppet / Puppet 8 - Debian 12
Canceling since a higher priority waiting request for 885/merge exists
Puppet / Puppet 8 - Debian 12
The operation was canceled.
Puppet / Puppet 8 - Rocky 9
Canceling since a higher priority waiting request for 885/merge exists
Puppet / Puppet 8 - Rocky 9
The operation was canceled.
Puppet / Puppet 8 - CentOS 9
Canceling since a higher priority waiting request for 885/merge exists
Puppet / Puppet 8 - CentOS 9
The operation was canceled.
Puppet / Test suite
Process completed with exit code 1.
CI
Canceling since a higher priority waiting request for 885/merge exists
CI
Canceling since a higher priority waiting request for 885/merge exists
Puppet / Static validations: metadata.json#L0
Skipping EOL operating system FreeBSD 12
Puppet / Static validations: metadata.json#L0
Skipping EOL operating system FreeBSD 11