Skip to content

Bump actions/setup-java from 4 to 5 #631

Bump actions/setup-java from 4 to 5

Bump actions/setup-java from 4 to 5 #631

Triggered via push August 21, 2025 05:14
Status Failure
Total duration 1m 11s
Artifacts

ci.yml

on: push
Matrix: Build and Test
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Build and Test (ubuntu-latest, 2.13.15, temurin@8)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 3.3.4, temurin@8)
The operation was canceled.
Build and Test (ubuntu-latest, 3.3.4, temurin@8)
The strategy configuration was canceled because "build.ubuntu-latest_2_13_15_tem" failed
Build and Test (ubuntu-latest, 2.13.15, temurin@17)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.15, temurin@17)
The strategy configuration was canceled because "build.ubuntu-latest_2_13_15_tem" failed
Build and Test (ubuntu-latest, 2.12.20, temurin@8)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.20, temurin@8)
The strategy configuration was canceled because "build.ubuntu-latest_2_13_15_tem" failed
Build and Test (ubuntu-latest, 2.12.20, temurin@17)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.20, temurin@17)
The strategy configuration was canceled because "build.ubuntu-latest_2_13_15_tem" failed
Build and Test (ubuntu-latest, 3.3.4, temurin@17)
The operation was canceled.
Build and Test (ubuntu-latest, 3.3.4, temurin@17)
The strategy configuration was canceled because "build.ubuntu-latest_2_13_15_tem" failed