Skip to content

Line graph: reset previous point between dataxy series to prevent unwanted poly‑line connection #524

Line graph: reset previous point between dataxy series to prevent unwanted poly‑line connection

Line graph: reset previous point between dataxy series to prevent unwanted poly‑line connection #524

Status Failure
Total duration 3m 47s
Artifacts

ci.yml

on: pull_request
Matrix: lint
Matrix: RBS
Matrix: test-jruby
Matrix: test-ruby
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Ruby 3.3
Process completed with exit code 1.
Ruby 3.0
The operation was canceled.
Ruby 3.0
The strategy configuration was canceled because "test-ruby._3_3_7_1_1-33_7_1" failed
Ruby 3.2
The operation was canceled.
Ruby 3.2
The strategy configuration was canceled because "test-ruby._3_3_7_1_1-33_7_1" failed
Ruby 3.1
The operation was canceled.
Ruby 3.1
The strategy configuration was canceled because "test-ruby._3_3_7_1_1-33_7_1" failed
Ruby 3.4
The operation was canceled.
Ruby 3.4
The strategy configuration was canceled because "test-ruby._3_3_7_1_1-33_7_1" failed