Added Milvus testing with the actual server #10
milvus-integration.yml
on: pull_request
Matrix: milvus-compatibility
Matrix: milvus-integration
Annotations
14 errors
|
milvus-compatibility (v2.3.0)
Process completed with exit code 1.
|
|
milvus-compatibility (v2.3.0)
Process completed with exit code 4.
|
|
milvus-compatibility (v2.4.15)
Process completed with exit code 1.
|
|
milvus-compatibility (v2.4.15)
The operation was canceled.
|
|
milvus-compatibility (v2.4.15)
The strategy configuration was canceled because "milvus-compatibility.v2_3_0" failed
|
|
milvus-compatibility (v2.4.0)
Process completed with exit code 1.
|
|
milvus-compatibility (v2.4.0)
The operation was canceled.
|
|
milvus-compatibility (v2.4.0)
The strategy configuration was canceled because "milvus-compatibility.v2_3_0" failed
|
|
milvus-integration (3.11)
Process completed with exit code 1.
|
|
milvus-integration (3.11)
Process completed with exit code 1.
|
|
milvus-integration (3.11)
Process completed with exit code 1.
|
|
milvus-integration (3.12)
Process completed with exit code 1.
|
|
milvus-integration (3.12)
The operation was canceled.
|
|
milvus-integration (3.12)
The strategy configuration was canceled because "milvus-integration._3_11" failed
|