Open
Description
hi,
regarding visjs timeline, a nice feature would be to have the possibility to add some items in the same line as other.
Example :
I have a box, then 3 month after the end of the box I would like to add a point. But, following your stack, group, subgroup, etc configuration, you have no way to be sure that the point will be on the same line.