Skip to content

Merge upstream/master into perf-dpa4-grid-contract #1150

Merge upstream/master into perf-dpa4-grid-contract

Merge upstream/master into perf-dpa4-grid-contract #1150

Triggered via push August 6, 2026 07:07
Status Cancelled
Total duration 7m 56s
Artifacts

build_cc.yml

on: push
Matrix: Build C++
Pass building C++
6s
Pass building C++
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Build C++ (clang, clang)
Canceling since a higher priority waiting request for Build C++-refs/heads/perf-dpa4-grid-contract exists
Build C++ (clang, clang)
The operation was canceled.
Pass building C++
Process completed with exit code 1.
Build C++
Canceling since a higher priority waiting request for Build C++-refs/heads/perf-dpa4-grid-contract exists