Skip to content

Add mp_ suffix back to test URLs #1133

Add mp_ suffix back to test URLs

Add mp_ suffix back to test URLs #1133

Triggered via push October 21, 2025 12:37
Status Failure
Total duration 6m 29s
Artifacts

ci.yaml

on: push
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
unit-tests (3.11)
Process completed with exit code 1.
unit-tests (3.10)
The strategy configuration was canceled because "unit-tests._3_11" failed
unit-tests (3.10)
The operation was canceled.
unit-tests (3.9)
The strategy configuration was canceled because "unit-tests._3_11" failed
unit-tests (3.9)
The operation was canceled.
unit-tests (3.12)
The strategy configuration was canceled because "unit-tests._3_11" failed
unit-tests (3.12)
The operation was canceled.