Skip to content

Merge ppy/master: 5 upstream commits (spectator preview, beatmap panel fixes, pen settings) #1897

Merge ppy/master: 5 upstream commits (spectator preview, beatmap panel fixes, pen settings)

Merge ppy/master: 5 upstream commits (spectator preview, beatmap panel fixes, pen settings) #1897

Re-run triggered May 1, 2026 12:08
Status Cancelled
Total duration 2h 2m 1s
Artifacts 1

ci.yml

on: pull_request
Matrix: Test
Test results
10s
Test results
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Test (Linux, ubuntu-latest, MultiThreaded)
Process completed with exit code 1.
Test (Windows, windows-latest, MultiThreaded)
The job has exceeded the maximum execution time of 2h0m0s
Test (Windows, windows-latest, MultiThreaded)
The operation was canceled.
Test results
Failed test were found and 'fail-on-error' option is set to true

Artifacts

Produced during runtime
Name Size Digest
osu-test-results-Linux-MultiThreaded Expired
3.72 MB
sha256:a0e23b480313a03604dd68f697e78a77d576cdfad04deae09db3bbba722503e9