Merge ppy/master: 5 upstream commits (spectator preview, beatmap panel fixes, pen settings) #1897
ci.yml
on: pull_request
Matrix: Test
Code Quality
5m 36s
Build only (Android)
15m 51s
Build only (iOS)
3m 32s
Test results
10s
Annotations
4 errors
|
Test (Linux, ubuntu-latest, MultiThreaded)
Process completed with exit code 1.
|
|
Test (Windows, windows-latest, MultiThreaded)
The job has exceeded the maximum execution time of 2h0m0s
|
|
Test (Windows, windows-latest, MultiThreaded)
The operation was canceled.
|
|
Test results
Failed test were found and 'fail-on-error' option is set to true
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
osu-test-results-Linux-MultiThreaded
Expired
|
3.72 MB |
sha256:a0e23b480313a03604dd68f697e78a77d576cdfad04deae09db3bbba722503e9
|
|