Skip to content

bump ppy.osu.Framework to 2026.501.2 (includes veldrid 4.9.18) #1912

bump ppy.osu.Framework to 2026.501.2 (includes veldrid 4.9.18)

bump ppy.osu.Framework to 2026.501.2 (includes veldrid 4.9.18) #1912

Status Cancelled
Total duration 2h 0m 56s
Artifacts 1

ci.yml

on: push
Matrix: Test
Test results
14s
Test results
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Test (Linux, ubuntu-latest, MultiThreaded)
Process completed with exit code 1.
Test (Windows, windows-latest, MultiThreaded)
The job has exceeded the maximum execution time of 2h0m0s
Test (Windows, windows-latest, MultiThreaded)
The operation was canceled.
Test results
Failed test were found and 'fail-on-error' option is set to true

Artifacts

Produced during runtime
Name Size Digest
osu-test-results-Linux-MultiThreaded Expired
3.71 MB
sha256:404a26f955235772fb2eab496c772b890c78bcb699c955eddfc4e8a4334d07c4