fix(frontend): non fusable graph is not an error #366
Triggered via pull request
October 7, 2025 21:54
Status
Cancelled
Total duration
13m 13s
Artifacts
–
concrete_ml_test.yml
on: pull_request
setup-instance
1m 22s
Matrix: build-and-run-tests
teardown-instance
28s
Annotations
3 errors
|
build-and-run-tests (3.10)
The operation was canceled.
|
|
build-and-run-tests (3.10)
Canceling since a higher priority waiting request for concrete_ml_test_refs/pull/1290/merge exists
|
|
concrete-ml test
Canceling since a higher priority waiting request for concrete_ml_test_refs/pull/1290/merge exists
|