fix(frontend): non fusable graph is not an error #3120
concrete_python_tests_linux.yml
on: pull_request
setup-instance
1m 11s
pre-commit-check
2m 59s
Matrix: build-python-bindings
test-apidoc-up-to-date
0s
teardown-instance
27s
Annotations
5 errors
|
pre-commit-check
Process completed with exit code 2.
|
|
build-python-bindings (3.9, /opt/python/cp39-cp39/bin/python)
Canceling since a higher priority waiting request for concrete_python_tests_linux_refs/pull/1290/merge exists
|
|
build-python-bindings (3.10, /opt/python/cp310-cp310/bin/python)
The operation was canceled.
|
|
build-python-bindings (3.10, /opt/python/cp310-cp310/bin/python)
Canceling since a higher priority waiting request for concrete_python_tests_linux_refs/pull/1290/merge exists
|
|
concrete-python tests linux-cpu
Canceling since a higher priority waiting request for concrete_python_tests_linux_refs/pull/1290/merge exists
|