Skip to content

bump ts

bump ts #4313

Triggered via push November 22, 2025 19:06
Status Failure
Total duration 5m 29s
Artifacts

ubuntu-tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 1.
build (3.11)
The strategy configuration was canceled because "build._3_10" failed
build (3.11)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_10" failed
build (3.12)
The operation was canceled.