Skip to content

Assuring streamflow data units are correct #12

Assuring streamflow data units are correct

Assuring streamflow data units are correct #12

Triggered via push July 24, 2025 16:24
Status Failure
Total duration 32s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.9)
Process completed with exit code 1.
test (3.8)
The operation was canceled.
test (3.8)
The strategy configuration was canceled because "test._3_9" failed
test (3.12)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_9" failed
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_9" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_9" failed