L1-282: Exponential inflation #3966
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
on-pull-request-commit.yml
on: pull_request
Build test aleph-node
/
Build aleph-node (production=false)
2m 43s
Build chain-bootstrapper
/
Build chain-bootstrapper (production=false)
5m 21s
Check code formatting
/
Run check, test and lints
26s
Build aleph-e2e-client image
/
Build aleph-e2e-client
3m 34s
Check PR title
3s
Check excluded packages
/
Check excluded packages
2m 34s
Unit tests and clippy
/
Run static checks (clippy)
2m 36s
Unit tests and clippy
/
Run unit tests
2m 19s
Check production node and runtime
/
Check production node and runtime
2m 42s
Check cliain build
/
Build or check cliain binary
1m 54s
Run e2e finalization test
0s
Run e2e token transfer test
0s
Check runtime metadata
/
Check runtime metadata
Check cliain build
/
Build and push cliain docker image to ecr
0s
Annotations
15 errors
Build aleph-e2e-client image / Build aleph-e2e-client
Process completed with exit code 1.
|
Check excluded packages / Check excluded packages
Canceling since a higher priority waiting request for 'refs/pull/1809/merge-PR commit' exists
|
Check excluded packages / Check excluded packages
The operation was canceled.
|
Check cliain build / Build or check cliain binary
Canceling since a higher priority waiting request for 'refs/pull/1809/merge-PR commit' exists
|
Check cliain build / Build or check cliain binary
Process completed with exit code 1.
|
Check cliain build / Build or check cliain binary
The operation was canceled.
|
Unit tests and clippy / Run static checks (clippy)
Canceling since a higher priority waiting request for 'refs/pull/1809/merge-PR commit' exists
|
Unit tests and clippy / Run static checks (clippy)
Process completed with exit code 1.
|
Unit tests and clippy / Run static checks (clippy)
The operation was canceled.
|
Check production node and runtime / Check production node and runtime
Canceling since a higher priority waiting request for 'refs/pull/1809/merge-PR commit' exists
|
Check production node and runtime / Check production node and runtime
The operation was canceled.
|
Build test aleph-node / Build aleph-node (production=false)
Canceling since a higher priority waiting request for 'refs/pull/1809/merge-PR commit' exists
|
Build test aleph-node / Build aleph-node (production=false)
The operation was canceled.
|
Unit tests and clippy / Run unit tests
Canceling since a higher priority waiting request for 'refs/pull/1809/merge-PR commit' exists
|
Unit tests and clippy / Run unit tests
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
chain-bootstrapper-image-test
Expired
|
76.8 MB |
sha256:8cddfb6e34846e65a2ff8bd379d11da70b43b5355de53978748f37e96602c4e8
|
|
chain-bootstrapper-test
Expired
|
9.1 MB |
sha256:a1068d9be5f8b3dee70f202d44f5f51be3e809a385bf0af7afb7a93a09fb99fb
|
|