Skip to content

A0-0000: Fix once again snapshot workflows #4396

A0-0000: Fix once again snapshot workflows

A0-0000: Fix once again snapshot workflows #4396

Triggered via pull request February 24, 2025 07:39
Status Cancelled
Total duration 8m 2s
Artifacts 4

on-pull-request-commit.yml

on: pull_request
Build test aleph-node  /  Build aleph-node (production=false)
4m 40s
Build test aleph-node / Build aleph-node (production=false)
Build chain-bootstrapper  /  Build chain-bootstrapper (production=false)
4m 54s
Build chain-bootstrapper / Build chain-bootstrapper (production=false)
Check code formatting  /  Run check, test and lints
37s
Check code formatting / Run check, test and lints
Build aleph-e2e-client image  /  Build aleph-e2e-client
4m 46s
Build aleph-e2e-client image / Build aleph-e2e-client
Check PR title
3s
Check PR title
Check excluded packages  /  Check excluded packages
5m 2s
Check excluded packages / Check excluded packages
Unit tests and clippy  /  Run static checks (clippy)
4m 30s
Unit tests and clippy / Run static checks (clippy)
Unit tests and clippy  /  Run unit tests
4m 2s
Unit tests and clippy / Run unit tests
Check production node and runtime  /  Check production node and runtime
4m 52s
Check production node and runtime / Check production node and runtime
Check runtime metadata  /  Build subxt
Check runtime metadata / Build subxt
Check cliain build  /  Build or check cliain binary
2m 21s
Check cliain build / Build or check cliain binary
Run e2e finalization test
0s
Run e2e finalization test
Run e2e token transfer test
0s
Run e2e token transfer test
Check runtime metadata  /  Check runtime metadata
Check runtime metadata / Check runtime metadata
Check cliain build  /  Build and push cliain docker image to ecr
0s
Check cliain build / Build and push cliain docker image to ecr
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Check PR title
Process completed with exit code 1.
Build aleph-e2e-client image / Build aleph-e2e-client
Canceling since a higher priority waiting request for 'refs/pull/1949/merge-PR commit' exists
Build chain-bootstrapper / Build chain-bootstrapper (production=false)
Canceling since a higher priority waiting request for 'refs/pull/1949/merge-PR commit' exists
Build chain-bootstrapper / Build chain-bootstrapper (production=false)
The operation was canceled.
Unit tests and clippy / Run static checks (clippy)
Canceling since a higher priority waiting request for 'refs/pull/1949/merge-PR commit' exists
Unit tests and clippy / Run static checks (clippy)
The operation was canceled.
Unit tests and clippy / Run static checks (clippy)
Process completed with exit code 1.
Unit tests and clippy / Run unit tests
Canceling since a higher priority waiting request for 'refs/pull/1949/merge-PR commit' exists
Unit tests and clippy / Run unit tests
Process completed with exit code 1.
Unit tests and clippy / Run unit tests
The operation was canceled.
Check production node and runtime / Check production node and runtime
Canceling since a higher priority waiting request for 'refs/pull/1949/merge-PR commit' exists
Check production node and runtime / Check production node and runtime
The operation was canceled.
Check excluded packages / Check excluded packages
Canceling since a higher priority waiting request for 'refs/pull/1949/merge-PR commit' exists
Check excluded packages / Check excluded packages
The operation was canceled.

Artifacts

Produced during runtime
Name Size Digest
aleph-e2e-client Expired
5.9 MB
sha256:4ddfde03a20c4e89db9a58661bdb9942dfa6209db88d427843ea41290503cc75
aleph-e2e-client-image Expired
74.1 MB
sha256:4f6e1a227536f751220ec0e576ec9a365df6ec8a4c10c168605d37260ee5b13d
aleph-node-image-test Expired
57.3 MB
sha256:3fa8bddaf62753dd8254e1c6c0fc8da8eef221a891de988d320aa85792fd3c18
aleph-node-test Expired
25.7 MB
sha256:567cb480c40983e3a7f8b8149e50543fa2a53ee9b1e118bcf4106006dc6af891