A0-4612: Fix update net test from Testnet to main #4421
on-pull-request-commit.yml
on: pull_request
Build test aleph-node
/
Build aleph-node (production=false)
0s
Build chain-bootstrapper
/
Build chain-bootstrapper (production=false)
0s
Check code formatting
/
Run check, test and lints
31s
Build aleph-e2e-client image
/
Build aleph-e2e-client
24s
Check PR title
2s
Check excluded packages
/
Check excluded packages
0s
Unit tests and clippy
/
Run static checks (clippy)
0s
Unit tests and clippy
/
Run unit tests
0s
Check production node and runtime
/
Check production node and runtime
7m 30s
Check cliain build
/
Build or check cliain binary
0s
Run e2e finalization test
0s
Run e2e token transfer test
0s
Check runtime metadata
/
Check runtime metadata
Check cliain build
/
Build and push cliain docker image to ecr
0s
Annotations
8 errors and 2 warnings
Build aleph-e2e-client image / Build aleph-e2e-client
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
Build aleph-e2e-client image / Build aleph-e2e-client
The operation was canceled.
|
Unit tests and clippy / Run unit tests
Canceling since a higher priority waiting request for 'refs/pull/1957/merge-PR commit' exists
|
Check excluded packages / Check excluded packages
Canceling since a higher priority waiting request for 'refs/pull/1957/merge-PR commit' exists
|
Build test aleph-node / Build aleph-node (production=false)
Canceling since a higher priority waiting request for 'refs/pull/1957/merge-PR commit' exists
|
Unit tests and clippy / Run static checks (clippy)
Canceling since a higher priority waiting request for 'refs/pull/1957/merge-PR commit' exists
|
Check cliain build / Build or check cliain binary
Canceling since a higher priority waiting request for 'refs/pull/1957/merge-PR commit' exists
|
Build chain-bootstrapper / Build chain-bootstrapper (production=false)
Canceling since a higher priority waiting request for 'refs/pull/1957/merge-PR commit' exists
|
Check PR title
The Ubuntu-20.04 brownout takes place from 2025-02-01. For more details, see https://github.com/actions/runner-images/issues/11101
|
Build chain-bootstrapper / Build chain-bootstrapper (production=false)
Runner i-090c02a1501fce91f did not respond to a cancelation request with 00:05:00.
|