Skip to content
This repository was archived by the owner on Jul 30, 2025. It is now read-only.

Fix TEE dependencies #1075

Fix TEE dependencies

Fix TEE dependencies #1075

Triggered via pull request July 16, 2025 11:11
Status Cancelled
Total duration 13m 9s
Artifacts 3

on-pull-request-commit.yml

on: pull_request
Check vars and secrets  /  Check available vars and secrets
4s
Check vars and secrets / Check available vars and secrets
Measure gas usage  /  Measure gas and verifier code size
5m 18s
Measure gas usage / Measure gas and verifier code size
Build wasm packages  /  Build wasm packages
5m 12s
Build wasm packages / Build wasm packages
Generate and compile contracts  /  Generate, compile and lint contracts
2m 1s
Generate and compile contracts / Generate, compile and lint contracts
Typescript modules checks  /  Run lints and tests
2m 38s
Typescript modules checks / Run lints and tests
Typescript modules checks  /  Run E2E tests on local anvil node
4m 31s
Typescript modules checks / Run E2E tests on local anvil node
Deploy contracts  /  Deploy contracts to the anvil network
25s
Deploy contracts / Deploy contracts to the anvil network
Rust crates checks  /  Run lints and tests
7m 39s
Rust crates checks / Run lints and tests
Rust crates checks  /  Run heavy tests
5m 35s
Rust crates checks / Run heavy tests
Clean wasm artifact
4s
Clean wasm artifact
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 4 warnings
Rust crates checks / Run lints and tests
Process completed with exit code 1.
Rust crates checks / Run lints and tests
The operation was canceled.
Rust crates checks / Run lints and tests
Canceling since a higher priority waiting request for refs/pull/280/merge-PR commit exists
Typescript modules checks / Run E2E tests on local anvil node
The operation was canceled.
Typescript modules checks / Run E2E tests on local anvil node
Canceling since a higher priority waiting request for refs/pull/280/merge-PR commit exists
PR commit
Canceling since a higher priority waiting request for refs/pull/280/merge-PR commit exists
PR commit
Canceling since a higher priority waiting request for refs/pull/280/merge-PR commit exists
PR commit
Canceling since a higher priority waiting request for refs/pull/280/merge-PR commit exists
Generate and compile contracts / Generate, compile and lint contracts
Cache not found for keys: linux-foundry-chain-fork-custom-seed-coverage-280/merge, linux-foundry-chain-fork-contract-suite, linux-foundry-chain-fork-
Measure gas usage / Measure gas and verifier code size
Cache not found for keys: linux-foundry-chain-fork-custom-seed-coverage-280/merge, linux-foundry-chain-fork-contract-suite, linux-foundry-chain-fork-
Rust crates checks / Run heavy tests
Cache not found for keys: linux-foundry-chain-fork-custom-seed-coverage-280/merge, linux-foundry-chain-fork-contract-suite, linux-foundry-chain-fork-
Typescript modules checks / Run E2E tests on local anvil node
Cache not found for keys: linux-foundry-chain-fork-custom-seed-coverage-280/merge, linux-foundry-chain-fork-contract-suite, linux-foundry-chain-fork-

Artifacts

Produced during runtime
Name Size Digest
contract-artifacts Expired
4.37 MB
sha256:eddedb5353e560fe51675157a48c4c27fc230f5d4baeba3f85ce93d838197148
generated-build-cache Expired
4.02 KB
sha256:4816c71324e993264119c3baee511ef0de482e7c8041e58ec2390b4430f5c8ca
generated-contracts Expired
58.6 KB
sha256:5de8ebc46c0dddc8c9f56129ffec1956e6d4d15f7b8a1819329ad239228686f3