Skip to content

Create test_integration.py #11

Create test_integration.py

Create test_integration.py #11

Triggered via push September 19, 2025 06:12
Status Failure
Total duration 20s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (3.11)
Process completed with exit code 1.
test (3.10)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_11" failed
lint
Process completed with exit code 2.